This job entailed the regeneration of the ‘central square’ area at the UEA.
Working both in and out of term time meant we had to time our deliveries to site and movements carefully with the UEA.
The job involved removal of all the paving and some existing drainage, replacement of drainage with additional, and reinstating new paving slabs with detailed cuts running through them as well as additional landscaping.