|
|
|
Client: Kier Group Contract Value: £145k
- A new teaching block extension to an existing public school.
- This job involved a lot of specialist on-site engineering to assist with such tasks as under-pinning of existing buildings and perimeter walls (over 100years old), deep drainage systems, and footpaths.
- The concreting had to be within very tight parameters to make sure the timber framed building sat exactly square on it.
- Completed in 2010.
|
|
|