Bure Valley School, Aylsham |
|
|
|
|
Client: Bure Valley, Aylsham Contract Value: £110k
- This job is the extension to an existing school.
- The works include excavation and reinforced strip foundations, new ducting and drainage and paving around the building.
- This job is on-going.
|
|
Central Square, UEA Norwich |
|
|
|
|
Client: Central Square, UEA Contract Value: £230k
- This job entailed the regeneration of the ‘central square’ area at the UEA.
- Working both in and out of term time meant we had to time our deliveries to site and movements carefully with the UEA.
- The job involved removal of all the paving and some existing drainage, replacement of drainage with additional, and reinstating new paving slabs with detailed cuts running through them as well as additional landscaping.
- Completed in 2009.
|
|
Easton College Equestrian Centre |
|
|
|
|
Client: Mansell Contract Value: £500k
- A prestigious development with a varied mix of buildings.
- Including a large indoor arena, stables, barns and an outside arena.
- Also construction of car parks and paddock areas.
- Completed in 2009.
|
|
Client: Kier Group Contract Value: £145k
- A new teaching block extension to an existing public school.
- This job involved a lot of specialist on-site engineering to assist with such tasks as under-pinning of existing buildings and perimeter walls (over 100years old), deep drainage systems, and footpaths.
- The concreting had to be within very tight parameters to make sure the timber framed building sat exactly square on it.
- Completed in 2010.
|
|
Client: Kier Group Contract Value: £420k
- A new 6th Form building within the grounds of an existing school. Project included extensions to classrooms.
- Traditional foundations and oversites, drainage and paving.
- Completed in 2009.
|
|
Thorpe Hamlet Primary School, Norwich |
|
|
|
|
Client: KIER Contract Value: £550k
- A replacement school with traditional foundations and oversites.
- Major works including construction of new car parks and play areas.
- Sub ground construction of drainage system.
- Completed in 2008.
|
|
|
|
|
|
|
|